What's being built
- A infrastructure project: PROPOSAL FOR ALTERATIONS AND ADDITIONS TO EXISTING SEWAGE TREATMENT PLANT · The addition of barbed wire to the top of two existing concrete walls · located at the entry of the Lower Molonglo Water Quality Control Centre..
- Lodged 10 May 2021 with ACT
- Belconnen
- determined 17 Jun 2021.
Who's involved
1 partyThis project has 1 party on record, across these roles:
ApplicantPro
Company profiles and full project details are a Pro feature.Sign in to unlock →
Documents
1 PDFApplication Form
ProOpening and downloading the source documents is a Pro feature.Sign in to unlock →
More development around Belconnen
187 DAs were lodged with ACT — Belconnen in the last 12 months, a typical decision takes about 51 days.