What's being built
- A $48M other project: Remove dividing wall between the two premises to be conducted by Re-Construct Australia.
- Work includes · Make area safe cut walls and core for needling Supply and install propping ready for demo.
- Demo 6300mm of wall and remove all rubbish.
- Supply and install Steel work.
- Repair floor gap where wall has been removed with composite flooring sheets.
- Box in steel work with mdf cladding.
The basics
Project value
$48,200,000
Homes / units
542