What's being built
- A renewable_energy project: Seeking building consent as a follow up to previously granted planning consent.
- 4.9 MW solar farm consisting of: Stage 1: 4176 x solar panels on PEG framing system Stage 2: 1 x 40 foot containerised PV inverter 1 x MV switchgear skid 1 x MV cable (500m) Stage 3 · 8352 x solar panels on PEG framing system.
- Lodged 8 Jul 2021 with Whyalla
- currently decision made.