What's being built
- A infrastructure project: Upgrade of existing telecommunications tower by way of:
- The replacement of six (6) existing antenna with six (6) new antenna for Optus and VHA measuring 2688 x 498 x 197 mm in length ·
- The installation of nine (9) new 5G panel antennas · (six (6) for Optus measuring 730 x 520 x 200mm · and three (3) for VHA (measuring 750x 450 x 240mm each) antennas mounted to a headframe at the top of the tower (total height of the facility 30m).
- Lodged 19 Jul 2021 with Campbelltown
- currently decision made.
Who's involved
0 partiesNo parties have been identified for this project yet — check back soon, as more become available over time.
Documents
0 PDFsNo documents are available for this project yet — check back soon, as more become available over time.
More development around Magill
813 DAs were lodged with Campbelltown in the last 12 months.