What's being built
- A infrastructure project: Enclose the area with additional wall.
- Space is approx 2 meters by 1.6 meters.
- Strip walls and install plumbing into walls.
- Professional waterproofer and professional tiler in to ensure wet area is up to code Plumbing of hand vanity sink will plumb into toilet · then sewerage line from the toilet will be connected to the main sewerage line at the Inspection point · located outside of the current ensuite.
- Toilet and sink to be installed.
- Exhaust fan to be installed.
Who's involved
0 partiesNo parties have been identified for this project yet — check back soon, as more become available over time.
Documents
0 PDFsNo documents are available for this project yet — check back soon, as more become available over time.
More development around Happy Valley
3,275 DAs were lodged with Onkaparinga in the last 12 months.