What's being built
- A infrastructure project: Remove existing above ground swimming pool.
- Install swim spa.
- Swim spa to sit on 150mm thick 32 MPA strength concrete slab with double SL72 mesh.
- Swim spa to utilise existing pool safety fencing and gates.
- Swim spa to run on a dedicated 32 amp power circuit to be installed by qualified electrician.
- Swim spa build and plumbing in accordance with supplied manufacturer's specifications and engineering plans.
Who's involved
0 partiesNo parties have been identified for this project yet — check back soon, as more become available over time.
Documents
0 PDFsNo documents are available for this project yet — check back soon, as more become available over time.
More development around Highbury
1,528 DAs were lodged with Tea Tree Gully in the last 12 months.