What's being built
- A commercial project: Variation to amend DA 21000612 for further additions and alterations to the existing retail fuel outlet.
- The proposed variation involves a reduction in scope of the works previously approved under DA 21000612 including: -removal of 11 metre entry tower and lounge addition from control building. · removal of outdoor dining area and shade umbrellas · removal of EV charging stations · picnic area.
- Lodged 21 Mar 2023 with Wakefield
- currently decision made.