What's being built
- A childcare project: Variation to application 24009673 childcare centre for 104 places with 22 on site car parks.
- There is no proposed changes to the number of places · position of the car park entry or previously endorsed parking layout.
- The proposed design draws upon the previously approved contemporary architectural plans but makes some positive improvements to the facade elements whilst reducing the overall gross building area by 19 square metres.
- Existing Traffic Report · Stormwater Management Report and Acoustic Report remain valid..
- Lodged 4 Nov 2024 with Holdfast Bay
- currently under assessment.
Who's involved
0 partiesNo parties have been identified for this project yet — check back soon, as more become available over time.
Documents
0 PDFsNo documents are available for this project yet — check back soon, as more become available over time.
More development around Glenelg East
705 DAs were lodged with Holdfast Bay in the last 12 months.
—
Under Assessment