What's being built
- A farming project: Lot 91 is currently vacant bare land.
- It is a route for westerly flows of runoff water during heavy rainfall · some of which collects in a depression at the western end of the block (see attached photo).
- We plan to excavate this low point to create a generously sized swale and plant the entire site with trees and bushes indigenous to the region.
- We also plan to place one or possibly two 20-foot shipping containers on the site for an indefinite period · aligned with the boundary · and with associated groundwork to ensure a tidy look and configuration.
- The containers will be painted COLORBOND 'Manor Red' to match our development planned on the other side of the road in Lot 90.
- We aim to collect water from the roof and store it in an adjacent water butt.
Who's involved
0 partiesNo parties have been identified for this project yet — check back soon, as more become available over time.
Documents
0 PDFsNo documents are available for this project yet — check back soon, as more become available over time.
More development around Carrieton
16 DAs were lodged with Orroroo Carrieton in the last 12 months.