What's being built
- A infrastructure project: Alterations and additions to an existing telecommunications facility including an equipment building (controlled environment vault (CEV)) · diesel generator and load bank for use in association with the proposed Telstra Inter-City Fibre Network · replacing the existing access gate · reconfiguring existing underground power supply.
- Lodged 12 Sept 2025 with Clare and Gilbert Valleys
- currently decision made.
Who's involved
0 partiesNo parties have been identified for this project yet — check back soon, as more become available over time.
Documents
0 PDFsNo documents are available for this project yet — check back soon, as more become available over time.
More development around Sevenhill
233 DAs were lodged with Clare and Gilbert Valleys in the last 12 months.