What's being built
- A infrastructure project: Retrospective excavation of sand using mechanical excavation methods involving excavator and dump trucks.
- Sand will be scrapped into piles and then loaded into dump trucks to be transported to the eastern side of the Marina.
- This sand is being used to rejuvenate the dune system along the beach preventing future erosion and impact to existing vegetation..
- Lodged 23 Jan 2026 with Kingston
- currently decision made.
Who's involved
0 partiesNo parties have been identified for this project yet — check back soon, as more become available over time.
Documents
0 PDFsNo documents are available for this project yet — check back soon, as more become available over time.
More development around Cape Jaffa
107 DAs were lodged with Kingston in the last 12 months.
—
Decision Made