What's being built
- A infrastructure project: Construction of two new 22.5 kl break pressure tanks coupled with a pressure sustaining valve · ancillary electrical and pipework infrastructure · security fencing and access track upgrades.
- Located adjacent to the existing pressure reducing valve (PRV) site at Kohinoor Hill.
- The precast concrete tanks would be above ground and have an approximate diameter of 3.62 m and a height of approx.
- 5.155 m · including a plinth and roof ventilation duct..
- Lodged 25 Oct 2023 with Kangaroo Island
- currently decision made.