What's being built
- A infrastructure project: Prepare the site for the three bedroom house and septic.
- Such as · soil testing has been done Building has been purchased.
- All applications require a site plan which shows the location of the proposed development and its surrounds.
- A site plan may include: The dimensions and boundaries of the site width 40.24m depth · 50.29m proposed boundary setbacks of the development the house will be placed 6m from the footpath (boundary) There in no existing buildings · trees.
- Lodged 2 Apr 2023 with Orroroo Carrieton
- currently decision made.
Who's involved
0 partiesNo parties have been identified for this project yet — check back soon, as more become available over time.
Documents
0 PDFsNo documents are available for this project yet — check back soon, as more become available over time.
More development around Orroroo Carrieton
16 DAs were lodged with Orroroo Carrieton in the last 12 months.